Recently, the main frame of the plant of the Sany Silicon Energy Nanjiang 2GW High-efficiency Crystalline Silicon Photovoltaic Module Production Base Project has been basically formed, and it is expected to be officially put into production in May this year.
It is understood that the products produced by the project use N-type TOPCon cells, provide a 30-year warranty, and the product power covers 430-680W, which is at the global leading level. The project is located in Nanjiang County, Bazhong City, Sichuan Province. It was signed on September 24, 2024, with a planned total investment of 500 million yuan. In September of the same year, the project held a groundbreaking ceremony and was originally planned to be completed and put into production in March 2025.